The Blog

Server Farm

AISO.net, a small server-farm company is operating off 100% solar power.

2,000 square foot building.

Solar panels generate 12 kilowatts

Battery storage runs night operation.

Run 4 IBM blades with virtualization software that lets one computer do the work of many.

Cooling system runs 10 minutes per hour.

Outside air is pumped into the building when it drops below 60 degrees.

Solar tubes in the roof provide lighting.

Operation costs $100,000.

Electic bill went from $3,000 per month to zero.

Full Article

Leave a Comment

Let us know your thoughts on this post but remember to place nicely folks!

You must be logged in to post a comment.